FloridaLandscapeIQ
How to Set Up a SFWMD-Compliant Irrigation Schedule in South Florida
How-To Guides

How to Set Up a SFWMD-Compliant Irrigation Schedule in South Florida

2025-04-01·6 min read·FloridaLandscapeIQ Staff
SFWMDIrrigationWater RestrictionsSouth FloridaCompliance

How to Set Up a SFWMD-Compliant Irrigation Schedule

The South Florida Water Management District (SFWMD) Year-Round Landscape Irrigation Rule is one of the most commonly violated environmental regulations in South Florida — not because contractors are ignoring it, but because many have never had it properly explained to them. Running sprinklers at the wrong time or on the wrong days can result in fines from $50 to $10,000 depending on violation history and municipality.

This guide walks through every element of the SFWMD rule and shows you how to program any irrigation controller to comply.


The Core SFWMD Year-Round Rule

SFWMD Rule 40E-24 establishes the baseline irrigation schedule for all properties in the South Florida Water Management District, which covers the 16 counties of South Florida including Miami-Dade, Broward, Palm Beach, Collier, and Monroe.

The basic restrictions:


Day Assignment by Address

The two permitted watering days are assigned based on your property address — specifically the last digit of the street address.

SFWMD Year-Round Watering Day Assignment by Address 2025

Day assignments apply district-wide as the minimum standard. Municipal overlays may be more restrictive. Verify with your local water utility for any local modifications. Source: SFWMD Year-Round Landscape Irrigation Rule 40E-24; FloridaLandscapeIQ, 2025.
Last Digit of Address Permitted Watering Days Examples
0 or 1 Monday and Thursday 100 Oak St, 4321 Palm Ave
2 or 3 Tuesday and Friday 123 Biscayne Blvd, 7892 Coral Way
4 or 5 Wednesday and Saturday 4455 Collins Ave, 9935 SW 8th St
6 or 7 Thursday and Sunday 1236 Flagler Dr, 8767 NE 2nd Ave
8 or 9 Friday and Monday 5678 US-1, 9489 Brickell Ave
No address / common area Wednesday and Saturday HOA common areas, medians

These are the SFWMD district-wide assignments. Some municipalities operate a separate schedule — Miami-Dade Water and Sewer, City of Miami, and Broward County utilities all have their own published schedules that you should verify before programming. Source: SFWMD 40E-24; FloridaLandscapeIQ, 2025.


Rain Sensor Requirements

Florida law (FS 373.62) requires a functioning rain shutoff device on all new irrigation systems installed after May 1991 and on any existing system that undergoes repair of 50% or more of its components.

What counts as compliant:

Common violations:

Fine for non-functional rain sensor: $50–$250 first offense in most jurisdictions. Higher for commercial properties.


How to Program Your Controller

Step 1 — Identify your permitted days Find the last digit of the property address. Match to the day assignment table above. Confirm against your local water utility for any municipal overlay.

Step 2 — Set watering hours Program start times so all zones complete their run before 10:00 AM or start no earlier than 4:00 PM. The safest approach is early morning starts (4:00 AM – 7:00 AM) when evaporation is lowest and pressure is adequate.

Step 3 — Cap zone run times SFWMD limits each zone to 1 hour per watering day. Most turf zones run 20–45 minutes. Shrub and planting zones typically run 10–30 minutes.

Step 4 — Test the rain sensor Pour water on the sensor disc or use the manufacturer's test procedure to confirm the controller shuts off when the sensor is triggered.

Step 5 — Document the setup For commercial properties and HOAs, maintain a controller log showing programming dates, zone schedules, and rain sensor test results. This documentation protects you if a violation notice is issued.


Exemptions to Know

The SFWMD rule includes specific exemptions that irrigation contractors need to understand:


What Happens If You Violate

Violations are enforced by water utilities, municipal code enforcement, and SFWMD directly. Inspectors patrol residential streets, particularly after rain events.

Typical fine structure:

For irrigation contractors: A licensed contractor whose installed system is cited can face licensing consequences through CILB. Ensuring the schedule is correct and documented before leaving a job site is both a legal and professional responsibility.

Find certified irrigation contractors and smart controller specialists through the FloridaLandscapeIQ Contractor Directory.

Source: SFWMD Year-Round Landscape Irrigation Rule 40E-24; Florida Statute 373.62; Miami-Dade Water and Sewer; FloridaLandscapeIQ Staff, April 2025.

← Back to BlogBrowse Our Contractor Directory